|
Roads & Highways.....

The history of human
civilization could well have begun with the development of pathways and
roads; for the movement of Men, Material and Machinery, the lifeline of
nation building, would have been impossible without arterial roads to
facilitate transport.
We understand that the most
effective way of adding
value to build environment is road construction. The construction and
maintenance of roads has been and shall remain a capital-intensive
continual process that is at core of any development activity: hence,
our commitment to it.
In 1999 - 2000, PIPL made a
foray into highway
construction with the Vadodara Halol road
project. There was no looking back after that. The Bavla ROB, including
approaches and the widening to four lanes of the NH 08 A, Ahmedabad
Bagodara Limadi, was one of the major projects undertaken. The
appreciation that came its way, particularly from the Railways, was
truly well deserved, considering that most ROBs are designed and
constructed by the Railway authorities.
The most demanding activity
like traffic safety is
considered on highest scale by authority and to improve the traffic
safety the authotiry has decided to provide and construct many footover
bridges for the safety of pedestrians and traffic flow.
The most glaring example
of such activity is
construction of additional 2 lane on 76 km long Sardar Patel Ring Road
around city within record time. 
Reaching out, providing
much needed connectivity, PIPL
is steadily, consistently strengthening the nation's infrastructure
base. Every step in this journey is a celebration of its commitment to
the country and to the people. In fact, the journey is itself the
destination!
|